SET CONTENTS: 4 DISC / 1 CUTTER / 1 MEASURING SPOON / INSTRUCTIONS; Please note: this product is not a full capsule! This product is to re-use the aluminium part of disposable capsules several times. NO aluminum foil, paper filters or other additional products required! (We have minimized packaging material as much as possible!) MATERIAL: Food-safe and heat-resistant PVC, BPA free, endlessly usable! SIZE: Espresso 1.35 fl oz / Double Espresso 2.7 fl oz / Gran Lungo 5.07 fl oz / Mug 7.77 fl oz / Alto 14.00 fl oz MACHINE TYPES: All coffee machines on the market for VertuoLine capsules
Make sure this fits by entering your model number.
Tired of the expensive disposable coffee capsules and all the waste? Here is the ingenious reusable solution! In no time, turn your disposable capsule into more than just a coffee, save a lot of money, choose your own coffee and the environment is happy!
It couldn't be easier: remove the foil from an original disposable capsule with the mini-cutter included in the set, the capsule size does not matter. Fill the empty aluminum capsule with the ground coffee of your choice and close it with the mycoffeestar DISC. Family or friends are visiting? No problem, because with the 4 DISC-SET you can fill 4 original disposable capsules at the same time.
SET CONTENTS: 4 DISC / 1 CUTTER / 1 MEASURING SPOON / Instruction card; PLEASE NOTE: no bottom of the capsule included - just the lids to refill Nespresso coffee pods with your own coffee!! You are re-using the aluminium part of a disposable capsules many times. With this eco-product NO aluminum foil, paper filters or other additional products are required! We have minimized packaging material as much as possible!
Fits for all capsule SIZES: Espresso 1.35 fl oz / Double Espresso 2.7 fl oz / Gran Lungo 5.07 fl oz / Mug 7.77 fl oz / Alto 14.00 fl oz MACHINE TYPES: All coffee machines on the market for VertuoLine capsules.
- FREE standard shipping within the United States(3-6 Days)on all orders!
- 100% money back guarantee for items not delivered or damaged during shipping.
- Safe and secure checkout with our high quality encryption
- Shipping services: UPS, FedEx, USPS.
- Only ship to the lower 48 states, no APO/FPO addresses or PO Boxes allowed.
- Local pickups and combined shipping options are not provided at this time.
- You can return a product for up to 30 days from the date you purchased it.
- Any product you return must be in the same condition you received it and in the original packaging. Please keep the receipt.
We accept payment by any of the following methods:
PayPal, Cerdit Cards
Customer satisfaction is very important to us.
If you have any problem with your order, please contact us and we will do our best to make you satisfied.
If you have any queries, please contact us via
Sales@ZeeBooth.com
We usually respond within 24 hours on weekdays.
















